
SIVB 507 aft skirt.
|

SIVB 507 aft skirt.
|

SIVB 507 aft skirt.
|

SIVB 505 aft skirt.
|

SIVB 211 forward skirt undergoing cold plate checkout. 506 aft skirt in
background.
|

SIVB 210 aft skirt.
|

Forward skirt, number
unknown.
|

SIVB 210 forward skirt.
|

Instrumentation unit &
SIVB 507 forward skirt
undergoing thermo-
conditioning check-out.
|

SIVB 9004 forward skirt is removed from the dynamic test area at Thiokol
Chemical Corp., Utah.
|

L to R, SIVB 507 thrust structure, aft skirt and
forward skirt. SIVB 211 in storage in the background.
|

SIVB 504 forward &
aft skirts.
|

L to R, SIVB 209 forward skirt, aft skirt and thrust structure. SIVB 205
aft interstage in shipping wrap.
|

L to R, 211 thrust
structure, 211 Forward
skirt and 211 aft skirt.
In background, aft 208
interstage and SIVB 209 awaiting painting.
|

SIVB 207 interstage in foreground, 210 aft skirt to left, 502 aft interstage
(center, left), 206 aft interstage (center, right) and 505 aft skirt in
extreme background.
|

Back to Front, SIVB 507 thrust structure, aft skirt and forward skirt.
SIVB 211 in storage to right.
|

SIVB 207 aft interstage.
|

SIVB 504 aft interstage
undergoing weight &
balance procedure.
|

SIVB aft skirt qualification
testing.
|

SV aft skirt qualification
test failure.
|

SIVB 505 aft interstage.
|

SIVB 505 aft interstage.
|

SIVB 505 aft interstage.
|

SIVB 505 aft interstage.
|

L to R, SIVB 502 aft interstage skirt & 206 aft interstage.
|

SIVB 207 aft interstage.
|

SIVB 506 interstage in foreground, SIVB 211 in storage in background. 208
forward skirt, aft skirt and thrust structure to right, rear.
|

L to R, SIVB 210 interstage & 211 interstage.
|

SIVB 207 interstage in foreground, 210 aft skirt to left, 502 aft interstage
(center, left), 206 aft interstage (center, right) and 505 aft skirt in
extreme background.
|

L to R, SIVB 507 forward skirt, aft skirt, and thrust structure.
SIVB 210 in background.
|

L to R, SIVB 210 forward skirt, aft skirt and thrust structure.
|

SIVB 207 aft interstage skirt (L) and SIVB 210 LH2 tank (R).
|

SIVB 207 aft interstage skirt is tilted 15 degrees during weight &
balance checks.
|

Adjusting calibrations during weight & balance of 207 aft interstage
skirt.
|

SIVB 207 aft interstage skirt is lowered onto support structure before
weight & balance check.
|

SIVB 505 forward skirt.
|

SIVB 503 / SII adapter skirt.
|
|
|
|
(Images
files are approximately 100K to 200K in size)