
SIVB 507 forward skirt being placed in position in tower 2. SIVB
508 propellant tank in left foreground, hydrostatic test tank at right.
|

SIVB 505 in stage joining position.
|

L to R, SIVB 505 & 211.
|

L to R, SIVB 505 & 211.
|

SIVB 209 enroute to
vertical check-out tower #8 for final leak check. 212 cylindrical
tank enroute to assembly/check-out tower.
|

SIVB 209
|

SIVB 209
|

SIVB 209
|

SIVB 209
|

SIVB 209
|

SIVB 510 being removed from tower 5 in Vehicle Assembly and Check-out Building.
|

SIVB 510
|

SIVB 510
|

SIVB 510
|

|SIVB 510
|

L to R, SIVB 508
& 212 in towers 7 and 8 respectively.
|

SIVB 212
|

SIVB 212 is hoisted into tower 8 for temporary storage after the removal
of SIVB 510.
|

Vertical check-out tower #5, SIVB 210 in
foreground and 505 in
tower.
|

SIVB 210 after final
painting.
|

SIVB 508 is hoisted into tower 7.
|

SIVB 508
|

SIVB 208 during weight & balance check.
|

SIVB 208 with technician checking level to correct adjustments during weight
& balance.
|

Overall view of the weight and balance area in the North end of the Manufacturing
Building. SIVB 208 in painting area.
|
(Images
files are approximately 100K to 200K in size)