![](s4b60tn.jpg)
SIVB 506 lowered into tower 1 for welding of forward
dome.
|
![](s4b59tn.jpg)
506 in tower 1.
|
![](s4b61tn.jpg)
Technician observes as forward dome is welded into
position.
|
![](s4b09tn.jpg)
SIVB 505 tank in
tower 8.
|
![](s4b62tn.jpg)
SIVB 506 being moved to the hydrostatic test tank.
|
![](s4b122tn.jpg)
Technicians applying aluminum foil cover to aft dome on SIVB 506.
|
![](s4b26tn.jpg)
SIVB 507 forward skirt being positioned for joining in tower 2, VA&C.
|
![](s4b27tn.jpg)
SIVB 507 in tower 2, 508 tank to left, 510 LOX tank to right.
|
![](s4b63tn.jpg)
SIVB 506 in hydrostatic testing tank.
|
![](s4b64tn.jpg)
Hydrostatic test tank control position.
|
![](s4b110tn.jpg)
Forward dome cover for Beta III test stand completed at the Douglas Santa
Monica plant.
|
![](s4b44tn.jpg)
SIVB 513 in tower 8.
|
![](s4b43tn.jpg)
SIVB 513 prior to raising into tower 8 of VA&C
building.
|
![](s4b42tn.jpg)
SIVB 513 is backed towards tower 8 of the Vehicle Assembly & Check-out
building.
|
![](s4b38tn.jpg)
SIVB 209 in the insulation chamber.
|
![](s4b39tn.jpg)
SIVB 208 in final assembly tower position and 210 forward dome in foreground.
|
![](s4b67tn.jpg)
L to R in vertical check-out positions, SIVB 209 & 210. In foreground,
SIVB 212 LOX tank.
|
![](s4b66tn.jpg)
SIVB 506 is pulled into insulation chamber #1.
|
![](s4b04tn.jpg)
SIVB 510 in weld & trim position with SIVB 212 in foreground.
|
![](s4b92tn.jpg)
SIVB 210 in foreground, 212 in vertical assembly weld position.
|
![](s4b102tn.jpg)
Technicians installing LH2 tank vent fill line in SIVB 505N.
|
![](s4b90tn.jpg)
Technicians insulating
forward dome of SIVB 506.
|
![](s4b89tn.jpg)
Technician removes vacuum bag from SIVB 211 after bonding of aluminum liner.
|
![](s4b120tn.jpg)
Engineer applying insulation to Orbital Workshop high velocity test panel.
|
|
(Images