A45 Vehicle Check-out
Lab, SIVB 207 & 209
inside.
|
L to R, SIVB 205, 206
& 207 outside Vehicle
Check-out Lab.
|
SIVB 206 removal from tower 2, VCL.
|
SIVB 206 is placed onto transporter, VCL.
|
SIVB 504 in tower 1, South bay of the Vehicle Check-out Lab.
|
View showing both
vertical and horizontal
long term storage covers during preliminary
functional tests.
|
L to R, SIVB 209 & 208 under long term storage covers in Engineering
&
Development building.
|
SIVB 208 on transporter & 209 in Tower 2 of the A45 Vehicle
Check-out
Lab.
|
SIVB 205 (horizontal),
206 (on bird cage) &
207 in North tower
of the A45 Vehicle
Check-out Lab.
|
Applying aluminized mylar to forward dome of SIVB 209 in Vehicle
Check-out Lab, tower 1.
|
SIVB 503 being
prepared for painting in
the A45 building.
|
SIVB 205 & 207 on bird cage in BG in the North bay of the Vehicle
Check-out Lab.
|
SIVB 205 in foreground with 207 on "bird cage" and 206 in tower 2 behind
in North bay of VCL.
|
SIVB 208 (horizontal)
& 209 in South tower
of the A45 Vehicle
Check-out Lab.
|
SIVB 209 (BG) & 208
(FG) in storage in the Engineering Development building.
|
Vertical storage cover
being lowered onto
SIVB 211 prior to being placed in tower 2 of VCL.
|
SIVB 211 in Vehicle
Check-out Lab tower 2
as storage covers are
being applied.
|
Lowering the J2 engine from SIVB 207 to allow installation of the Augmented
Spard Assembly in the A45 Vehicle Check-out Lab.
|
SIVB 207 (FG) & 208 in the A-45 Vehicle
check-out lab.
|
Consoles manned inside
the Alpha blockhouse
during test of the DA-103 Common Bulkhead Specimen.
|
|
SIVB 209 entering the
door of the Engineering
Development building.
|
SIVB 209 entering the
door of the Engineering
Development building.
|
SIVB 505 enroute to
Mather AFB with Beta
test stands in distance.
|
|
(Images
files are approximately 100K to 200K in size)